LEGACY CONTROL SYSTEM UPGRADES

We know legacy control systems.

We know our customers.

We know that most of our customers with legacy control systems have migration plans.

 

"Stuff" can happen between planning and implementation.

But what happens when bad things happen to good plans?

 

How can you anticipate and prepare for system failure during your migration process?  By letting PSI provide you with a head start.

 

What can we do to help? In advance of the migration roll-out, PSI can provide:

 

Cost Estimates

• For budgetary purposes

• Quote for your purchase order

Timing Estimates

• Design only

• Total project

• Requirements for installation downtime

A Head Start

• Gain a 2 to 8 week head start on your development and installation by having us deliver your control system design early. (Head start time is dependent on the size of the control system.)

• Gain even more of a head start by having us work on the development of the system, up to the FAT or installation.

 

Should you have a failure, we are ready to provide support consistent with your migration plan.

 

Whenever you are ready to implement your migration plan,

we'll be ready as well.

 

No migration plan in place?

Don’t wait for a control system failure to develop one.

Primary Systems Inc. - Control and Automation Solutions

30 NJ-18 | Suite 1 | Old Bridge NJ 08857 | USA

732.679.2200

Scott Alter, VP Control and Automation Solutions

©2019 PRIMARY SYSTEMS INC.